What the filing says
A public-record reading of the proposed work.
General construction work filed for garage on floors 001.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story office building built in 1918, on a 112,666 sq ft lot.
- Built
- 1918
- Last altered
- 2015
- Floors
- 7
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- M3-1
- Lot area
- 112,666 sq ft
- Building area
- 382,080 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 26, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 166 notices on file; the most recent was issued Jan 22, 2025.
- Fail to certify class
Issued Jan 22, 2025 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
- Construction
Issued Nov 15, 2024 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED MULTIPLE CRACK IN THE SUPPORT COLUMNS THROUGHOUT THE UNDERGROUND PARKING AREA, ALONG WITH CRACKS IN THE EXTERIOR WALLS OF PARKING GARAGE
- Elevator
Issued Nov 15, 2004
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 26, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00567829-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00567829-I1
- BBL
- 3008030192
- Postal code
- 11232 · 1567 filings
- Review type
- Professional Certification
- Existing stories
- 7
- Proposed stories
- 7
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








