What the filing says
A public-record reading of the proposed work.
Non-structural interior demolitions and no modification to base building mep system. work limited to removal of tenant-level fixtures and distribution only of ground and mezzanine . all work is limited to tenant space only.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story elevator apartment building built in 1877, with 12 homes, on a 8,812 sq ft lot.
- Built
- 1877
- Floors
- 5
- Residential units
- 12
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- M1-5/R9X
- Lot area
- 8,812 sq ft
- Building area
- 42,111 sq ft
- Historic district
- SoHo-Cast Iron Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 31 notices on file; the most recent was issued Jul 5, 2019.
- Landmark
Issued Jul 5, 2019
- Non-residential elevator periodic
Issued May 20, 2019 — FAILURE TO PERFORM CATEGORY 5 INSPECTION
- Elevator
Issued Apr 4, 2018
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01418646-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 71,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01418646-I1
- BIN
- 1003031
- BBL
- 1002320009
- Postal code
- 10013 · 518 filings
- Review type
- Professional Certification
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 12
- Proposed dwelling units
- 12