What the filing says
A public-record reading of the proposed work.
Herewith filing an application to enclose an area of the existing 7th floor to create an enclosed glass deck. no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1935, with 12 homes, on a 1,953 sq ft lot.
- Built
- 1935
- Floors
- 6
- Residential units
- 12
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- C6-2
- Lot area
- 1,953 sq ft
- Building area
- 9,422 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 6 notices on file; the most recent was issued Feb 13, 2026.
- Construction
Issued Feb 13, 2026 — WORK WITHOUT PERMIT. ATOI, OBSERVED ROOF OF A 6 STORY BUILDING HAS BEEN ILLEGALLY ALTERED. NOTED ROOF VERTICALLY/HORIZONTALLY ENLARGED, & FULLY ENCLOSED, CREATING 7TH FLOOR. NOTED VERTICAL CRACKS RUNNING FROM 3RD FLR. TO THE ROOF AT EXP2 & EXP4. CREATING AN IMMEDIATE UNSAFE HAZARD FOR OCCUPANTS, NEARBY PUBLIC AND PROPERTY. NO PERMITS ON FILE.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01457817-I1.
- Current status updated02
The latest recorded filing status is “Pending CPE/ACPE Assignment.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01457817-I1
- BBL
- 3001080019
- Postal code
- 11201 · 3965 filings
- Review type
- Standard Plan Examination
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 12
- Proposed dwelling units
- 12