What the filing says
A public-record reading of the proposed work.
Removal of interior non-load bearing partitions, mill work, plumbing fixtures & HVAC unit. no change in use, egress, or occupancy proposed under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 12-story condominium built in 1901, with 21 homes, on a 1,626 sq ft lot.
- Built
- 1901
- Last altered
- 2010
- Floors
- 12
- Residential units
- 21
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C6-4M
- Lot area
- 1,626 sq ft
- Building area
- 42,845 sq ft
- Historic district
- Ladies' Mile Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 7 open notices on record for this building, out of 89 notices on file; the most recent was issued Sep 14, 2026.
- Landmark
Issued Sep 14, 2026
- Failure to submit
Issued Jun 23, 2024 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)
- Failure to submit
Issued Apr 22, 2023 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2022
4 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01380324-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 69,387 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01380324-I1
- BBL
- 1008207501
- Postal code
- 10011 · 521 filings
- Review type
- Professional Certification
- Existing stories
- 14
- Proposed stories
- 14
- Existing dwelling units
- 24
- Proposed dwelling units
- 24








