What the filing says
A public-record reading of the proposed work.
Installation Of Temporary Material Hoist As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 16-story condominium built in 1956, with 156 homes, on a 14,560 sq ft lot.
- Built
- 1956
- Floors
- 16
- Residential units
- 156
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C5-2.5
- Lot area
- 14,560 sq ft
- Building area
- 144,569 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 5, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 17 open notices on record for this building, out of 79 notices on file; the most recent was issued Jul 12, 2025.
- Construction
Issued Jul 12, 2025 — STRUCTURE RENDERED NON COMPLIANT DUE TO TAXI IMPACTING BUILDING AT COR NER OF EXPOSURES 1 AND 4 DISPALCING 30"X30" ORNAMENTAL CONCRETE STONES ON VENEER , ALSO DISPLACED 3/LEGS ON SIDEWALK SHED THE STRUCTURE MUST BE MAINTAINED IN A CODE COMPLIANT MANNER
- Failure to submit
Issued Jun 23, 2024 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)
- Fail to certify class
Issued Apr 3, 2024 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
14 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 6, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01403754-P1.
- Current status updated02
The latest recorded filing status is “Plan Examiner Review.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 92,577 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01403754-P1
- BBL
- 1013107502
- Postal code
- 10022 · 1385 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 157
- Proposed dwelling units
- 157








