NYC DOB record · M01306253-S1

140 Fulton Street

140 Fulton Street, Manhattan, NY 10038

New building filing in Financial District-Battery Park City, Manhattan. The latest DOB status is plan examiner review.

A DOB plan examiner is reviewing the application. Nothing has been approved yet. What every status means

Under reviewNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 15, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01306253-S1

140 Fulton Street

Manhattan, NY 10038

New building · status dated Sep 10, 2026

Current record
Under review
Proposed scale
42 stories
Dwelling units
99
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01306253-S1 as a new building at 140 Fulton Street, Manhattan, NY 10038. Its latest published status category is Under review, dated Sep 10, 2026. The filing records 42 proposed stories and 99 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Under review
Latest status date
Sep 10, 2026
Proposed scale
42 proposed stories and 99 proposed dwelling units
Applicant of recordSee the 91 filings that name Desimone Consulting Engineers
FiledSep 8, 2026
Current recordUnder review
Proposed scale42 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Foundation work in conjunction with NB

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a vacant land on a 5,612 sq ft lot.

Residential units
0
Building type
Vacant land
Land use
Vacant land
Zoning district
C5-5
Lot area
5,612 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 24, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 21 notices on file; the most recent was issued Mar 19, 2013.

  • Construction

    Issued Mar 19, 2013 — FAILURE TO MAINTAIN BUILDING DUE TO FIRE

  • Construction

    Issued Mar 19, 2013 — FAILURE TO MAINTAIN BUILDING DUE TO FIRE

  • Elevator

    Issued Dec 21, 2010

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01306253-S1.

    01
  2. Current status updated

    The latest recorded filing status is “Plan Examiner Review.”

    02

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01306253-S1
BIN
1091689
BBL
1000790027
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
42
Existing dwelling units
Empty in the source
Proposed dwelling units
99
Foundation workEarthwork