NYC DOB record · M01356418-I1

140 Thompson Street

140 Thompson Street, Manhattan, NY 10012

Alteration filing in Soho-Little Italy-Hudson Square, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 7, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01356418-I1

140 Thompson Street

Manhattan, NY 10012

Alteration filing · status dated Nov 5, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
30
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01356418-I1 as a alteration filing at 140 Thompson Street, Manhattan, NY 10012. Its latest published status category is Recorded as completed, dated Nov 5, 2026. The filing records 30 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Nov 5, 2026
Proposed scale
30 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1008024Applicant of recordSee the 6 filings that name Raymond Nerenberg PE
FiledFeb 26, 2026
Current recordRecorded as completed
Proposed scale30 units
Recorded cost$150,000

What the filing says

A public-record reading of the proposed work.

Respectfully request to file Post Approval Amendment to include details & additional notes as per building's final Inspection. No change in use, egress, or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story elevator apartment building built in 1885, with 30 homes, on a 15,322 sq ft lot.

Built
1885
Last altered
1978
Floors
6
Residential units
30
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7-2
Lot area
15,322 sq ft
Building area
86,018 sq ft
Historic district
SoHo-Cast Iron Historic District Extension

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 5, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 25 notices on file; the most recent was issued Oct 17, 2025.

  • Construction

    Issued Oct 17, 2025 — REFER TO COMMISSIONER'S ORDER: 1) BRING STRUCTURE INTO COMPLIANCE THROUGH REMOVAL OR REPAIR. 2) PROVIDE MONTHLY STRUCTURAL STABILITY REPORTS. REMEDY: COMPLY WITH THE ORDER OF THE COMMISSIONER

  • Fail to certify class

    Issued Jul 24, 2024 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • Construction

    Issued Sep 5, 2023 — BOROUGH COMMISSIONER STOP WORK ORDER FOR APPLICATION #123855925 REVOKED PERMIT(S) AND APPROVAL(S). STOP ALL WORK MAKE SITE SAFE

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 6, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01356418-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 93,320 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01356418-I1
BBL
1005160007
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
30
Proposed dwelling units
30