What the filing says
A public-record reading of the proposed work.
Facade repairs as per drawings. there is no change to use. egress. or occupancy
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1998, with 66 homes, on a 14,988 sq ft lot.
- Built
- 1998
- Floors
- 6
- Residential units
- 66
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7-2
- Lot area
- 14,988 sq ft
- Building area
- 47,506 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 38 notices on file; the most recent was issued Dec 1, 2023.
- Failure to post energy
Issued Dec 1, 2023 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
- No report and / or late filing (facade)
Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
- Failure to post energy
Issued Dec 1, 2022 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01446758-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01446758-I1
- BIN
- 1060096
- BBL
- 1020100050
- Postal code
- 10030 · 107 filings
- Review type
- Professional Certification
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 66
- Proposed dwelling units
- 66