What the filing says
A public-record reading of the proposed work.
Relocation of existing exit stair servicing existing retail storage area of south cellar, discharging at the first floor.the exit stair services only the cellar retail storage space and is not a major change of exits to the building.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a condominium with 2659 homes, on a 951,289 sq ft lot.
- Residential units
- 2659
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- R6
- Lot area
- 951,289 sq ft
- Building area
- 2,199,075 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 7, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 34 notices on file; the most recent was issued Feb 22, 2023.
- No report and / or late filing (facade)
Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
- Elevator
Issued Sep 30, 1997
- Construction
Issued Dec 20, 1989
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 7, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01260474-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01260474-I1
- BBL
- 2039387501
- Postal code
- 10462 · 207 filings
- Review type
- Standard Plan Examination
- Existing stories
- 8
- Proposed stories
- 8
- Existing dwelling units
- 54
- Proposed dwelling units
- 54