What the filing says
A public-record reading of the proposed work.
Resolve ecb violation: 39190092j; remove illegal wood frame shed storage (10'x10') at rear yard as per plan. no change in use, egress or occupancyunder this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story mainly residential with some commercial built in 1933, on a 1,770 sq ft lot.
- Built
- 1933
- Floors
- 2
- Residential units
- 1
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- R6A
- Lot area
- 1,770 sq ft
- Building area
- 2,800 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 7 notices on file; the most recent was issued May 27, 2026.
- Construction
Issued May 27, 2026 — STRUCTURE RENDERED NON COMPLIANT PREMISES IS A 2 STORY MIXED USE NON FIREPROOF WOOD FRAME BUILDING. HEAVY SMOKE FIRE AND WATER DAMAGE THROUGHOUT. WINDOWS AND CEILINGS MISSING, FLOOR TO CEILING PARTITIONS MISSING,LARGE SECTION OF ROOF MISSING
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01432584-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01432584-I1
- BIN
- 3121165
- BBL
- 3052350033
- Postal code
- 11230 · 1515 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 1
- Proposed dwelling units
- 1








