What the filing says
A public-record reading of the proposed work.
Erect 8ft plywood tightboard fence at exposure#1 to enclose site according to DOB emergency dec # 20047.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story walk-up apartment building built in 1931, with 6 homes, on a 2,500 sq ft lot.
- Built
- 1931
- Floors
- 3
- Residential units
- 6
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R6
- Lot area
- 2,500 sq ft
- Building area
- 4,350 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 24, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 27 open notices on record for this building, out of 29 notices on file; the most recent was issued Mar 4, 2026.
- Construction
Issued Mar 4, 2026 — FULL VACATE AND FAILURE TO MAINTAIN BLDG IN SAFE CONDITION THE BLDG WAS IN A STATE OF DISREPAIR W/FLOORS&WOOD GIRDRS@REAR HALF OF THE BLDG W/1ST TO 3RDFL HEAVILY SAGGNG,DETERIORATD,&STRCTRLLY CMPRMSD.OWNR TO RTAIN NYSPE TO EVAL THE ENT BLDG&PERM RPAIR UNDER PERMIT.STRT WRK BY 5/4/26&CMPLTD/SGND OFF BY 71/1/2026
- Construction
Issued Feb 13, 2026 — STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED AT APARTMENT 2R FLOOR SEVERELY SLOPPING AT KITCHEN/BATHROOM. STRUCTURAL DAMAGE TO SUPPORTING FLOOR JOIST.
- Construction
Issued Jan 29, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED IN MULTIPLE APARTMENTS SEVERELY UNEVEN/SLOPPED FLOORS ALONG WITH CORRESPONDING CEILINGS ABOVE/BELOW. AT CELLAR MAIN SUPPORT GIRDER SEVERELY SAGGING SHOWS SIGNS OF DETERIORATION WITH SHORING WORK PERFORMED.
24 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01440699-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01440699-I1
- BIN
- 3073819
- BBL
- 3032460012
- Postal code
- 11237 · 1737 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 6
- Proposed dwelling units
- 0








