NYC DOB record · B00402349-I1

1417 Avenue J

1417 Avenue J, Brooklyn, NY 11230

Alteration filing in Midwood, Brooklyn. The latest DOB status is filing withdrawn.

The applicant withdrew this filing, so it is not going forward. What every status means

Closed or withdrawnAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00402349-I1

1417 Avenue J

Brooklyn, NY 11230

Alteration filing · status dated Apr 17, 2024

Current record
Closed or withdrawn
Proposed scale
Not stated
Dwelling units
17
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00402349-I1 as a alteration filing at 1417 Avenue J, Brooklyn, NY 11230. Its latest published status category is Closed or withdrawn, dated Apr 17, 2024. The filing records 17 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Closed or withdrawn
Latest status date
Apr 17, 2024
Proposed scale
17 proposed dwelling units
Complete building dossierView all 6 filings associated with BIN 3179617Applicant of recordSee the 31 filings that name Fc Consulting Engineer, PLLC
FiledOct 14, 2020
Current recordClosed or withdrawn
Proposed scale17 units
Recorded cost$12,000

What the filing says

A public-record reading of the proposed work.

Install new kitchen hood, exhaust fan and associated duct work as per plan. no change to use, egress or occupancy under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

No open violations are recorded for this building. 23 notices are on file, all with a recorded resolution.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00402349-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Filing Withdrawn.”

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00402349-I1
BBL
3067070044
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
17
Proposed dwelling units
17