NYC DOB record · B00349703-I1

142 South Portland Avenue

142 South Portland Avenue, Brooklyn, NY 11217

Alteration filing in Fort Greene, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00349703-I1

142 South Portland Avenue

Brooklyn, NY 11217

Alteration filing · status dated Apr 9, 2024

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
104
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00349703-I1 as a alteration filing at 142 South Portland Avenue, Brooklyn, NY 11217. Its latest published status category is Recorded as completed, dated Apr 9, 2024. The filing records 104 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Apr 9, 2024
Proposed scale
104 proposed dwelling units
The building, not the filingwhat it sold for, apartment sizes, the owner of record and every filing at BIN 3427387Applicant of recordSee the 95 filings that name Joselow And Associates
FiledJun 3, 2021
Current recordRecorded as completed
Proposed scale104 units
Recorded cost$420,597

What the filing says

A public-record reading of the proposed work.

Complete combined sprinkler and standpipe system for a new 13 story+cellar, mixed-use, building with 104 units and community facilities. filed in conjunction with NB Job#321593101; Pluming work type is only filed for plumbing work associated with SP/ SD.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

No open violations are recorded for this building. 1 notice is on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00349703-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00349703-I1
BBL
3020030037
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
104
plumbingsprinklerstandpipe