What the filing says
A public-record reading of the proposed work.
Soe filed in-order to comply with emergency work order and stop work order and resolve DOB violation# 26-01635, ce41301jr.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 1-story one-family home built in 1955, on a 4,000 sq ft lot.
- Built
- 1955
- Floors
- 1
- Residential units
- 1
- Building type
- One-family home
- Land use
- One and two family homes
- Zoning district
- R3-1
- Lot area
- 4,000 sq ft
- Building area
- 1,150 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 3 notices on file; the most recent was issued Jul 13, 2026.
- Construction
Issued Jul 13, 2026 — EMERGENCY:UNPERMITTED ALT/EXCV FOR EXT W/IN ZONE OF INFL OF GARAGE EXP 3 FNFN WALL REMOVED;BLDG COMPROMISED.REMEDY:HIRE NY P.E IMMEDIATELY FOR HOME/GARAGE STABILIZATION.START BY 7/13/26.FILE PLANS WITH DOB WITHIN 2 BUSINESS DAYS
- Construction
Issued Jun 23, 2026 — OBSERVED THE EXISTING REAR CELLAR LEVEL FOUNDATION WALL & ROOF SHEATHING WAS COMPLETELY REMOVED WITHOUT A PERMIT & NO ADEQUATE SUPPORT IN PLACE FOR THE ROOF COMPROMISING THE BUILDING LOAD PATH.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 1, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01461319-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01461319-I1
- BIN
- 4287474
- BBL
- 4135070005
- Postal code
- 11413 · 117 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 1
- Proposed dwelling units
- 2








