NYC DOB record · B01481174-I1

143 9 Street

143 9 Street, Brooklyn, NY 11215

Alteration filing in Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 1, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01481174-I1

143 9 Street

Brooklyn, NY 11215

Alteration filing · status dated Oct 30, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
7
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01481174-I1 as a alteration filing at 143 9 Street, Brooklyn, NY 11215. Its latest published status category is Approved, dated Oct 30, 2026. The filing records 7 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 30, 2026
Proposed scale
7 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 3022036Applicant of recordSee the 8 filings that name Raj LLC
FiledOct 29, 2026
Current recordApproved
Proposed scale7 units
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

PMM application filed in conjunction to ALT - CO GC application: B01193391-I1 To install a pump jack as per plans

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story walk-up apartment building built in 1931, with 5 homes, on a 2,500 sq ft lot.

Built
1931
Floors
3
Residential units
5
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
M1-4/R6B
Lot area
2,500 sq ft
Building area
2,820 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 1, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 5 notices on file; the most recent was issued Jan 4, 2024.

  • Construction

    Issued Jan 4, 2024 — EMRCY WRK-FIRE ON 12/21/23.REAR ROOF PARTLY CLLPSD/HEAVILY SAGGNG RMAINING ROOF FRAMNG FIRE DMGD,PRTLY DTACHD &@RISK FURTHR COLLPS FRNT ROOF PRTLY OPN.EXT WALL INADQTLY BRACD @ROOF.EXP4 @3FL PART OPEN IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER #343376

  • Construction

    Issued Dec 22, 2023 — FTM-FIRE ON 12/21/23.REAR ROOF PARTLY COLLPSD/HEAVLY SAGGING RMAINING ROOF FRAMNG FIRE DMGHD,PARTLY DTACHD &@RISK FURTHR COLLPS.EXT WALL INADQTLY BRACD.3FL JOISTS INDQTLY BRACD @EXP3&4 BEARNG WALLS COORDINATE W/EWO 122223FEU30601PN TO PART DEMO &WEATHR PROOF BLDG.OWNR RTAIN NYSPE-EVAL ENTIRE BLDG &FILE RPR DWGS

  • Construction

    Issued Dec 22, 2023 — EMRCY WRK-FIRE ON 12/21/23.REAR ROOF PARTLY COLLPSD/HEAVILY SAGGING RMAINING ROOF FRAMNG FIRE DMGD,PRTLY DTACHD &@RISK FURTHR COLLPSD FRNT ROOF PARTLY OPN.EXT WALL INADQTLY BRACD @ROOF.EXP4@3FL PART OPEN IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER #343376

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 1, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01481174-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 91,066 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01481174-I1
BBL
3010020055
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
6
Proposed dwelling units
7