What the filing says
A public-record reading of the proposed work.
Limited to repair of existing exterior facade elements of 6-story nycha multiple dwelling as part of the nycha pact renovation in conjunction with required local law inspection (fisp). no changes to use, egress, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story walk-up apartment building built in 1920, with 19 homes, on a 3,747 sq ft lot.
- Built
- 1920
- Last altered
- 1989
- Floors
- 6
- Residential units
- 19
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R7-2
- Lot area
- 3,747 sq ft
- Building area
- 14,652 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 31, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 11 notices on file; the most recent was issued Sep 25, 2020.
- Failure to correct swarmp conditions (facade)
Issued Sep 25, 2020 — NYCHA CYCLE 9C FAILURE TO CORRECT SWARMP CONDITIONS
- Hazardous condition (facade)
Issued Sep 23, 2020 — NYCHA CYCLE 9C UNSAFE REPORT FILED
- Hazardous condition (facade)
Issued Sep 23, 2020 — NYCHA CYCLE 8C UNSAFE REPORT FILED
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 31, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00883157-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 91,066 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00883157-S1
- BBL
- 1020120015
- Postal code
- 10030 · 221 filings
- Review type
- Professional Certification
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 15
- Proposed dwelling units
- 15








