What the filing says
A public-record reading of the proposed work.
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300psf.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 22-story office building built in 1954, on a 16,647 sq ft lot.
- Built
- 1954
- Floors
- 22
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- C5-3
- Lot area
- 16,647 sq ft
- Building area
- 364,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 23, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 10 open notices on record for this building, out of 141 notices on file; the most recent was issued Sep 26, 2024.
- Immediate
Issued Sep 26, 2024 — PROVIDE APPRX 40 LINEAR FEET OF CONSTRUCTION FENCE @ EXPO#2 (WEST 40 S TREET) TO EXTEND TO THE CURB LINE & APPRX 30 LINEAR FEET OF CONSTRUCTI ON FENCE @ EXPO#1 (BROADWAY) TO EXTEND TO THE CURB LINE IN AN L SHAPE TO SAFEGUARD PUBLIC AND PROPERTY
- Construction
Issued Sep 26, 2024 — EMERGENCY WORK.AT THE EXP 1/2 CORNER,THERE WERE 4MARBLE PANELS W/A 24 OUTWRD BULGE@EXP SIDE ON 3RD STRY.ALSO AT EXP 1/2CRNR,2MARBLE PANELS HAD A 1/2 OUTWRD BYKGE@EXP 1 SIDE ON 3RD&4THFL LVL.1.IMMED INSTLL CONSTRCTN FENCE TO ENCLOSRE 15MIN OF SDWALK @EXP1&EXP2 FOR DSTNCE OF 30''ALNG EXP1&40'ALNG EXP2 TO SRRND
- Construction
Issued Sep 26, 2024 — EMERGENCY WORK.@THE EXP1/2 CRNR,THERE WAS 4MARBLE PANELS W/2" OUTWRD BLGE@EXP2 SIDE ON 3RD STRY.ALSO@EXP 1/2CRNR, MARBLE PANELS HAD A 1/2 OUTWRD BLGE@EXP1 SIDE ON 3RD&4THFL LEVELS.1.IMMED INSTLLSHRNG&BRACNG & RMVE BULGD MARBLE CLADDNG@DIRCTN OF PE,2.ALL WRK TO BE DRCTLY SPRVSD& DRCTD BY ONSITE NYSPE
7 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 23, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01122842-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 85,681 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01122842-I1
- BBL
- 1008150046
- Postal code
- 10018 · 526 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0