NYC DOB record · S01289091-I1

1430 Richmond Avenue

1430 Richmond Avenue, Staten Island, NY 10314

Alteration filing in New Springville-Willowbrook-Bulls Head-Travis, Staten Island. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 18, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · S01289091-I1

1430 Richmond Avenue

Staten Island, NY 10314

Alteration filing · status dated Oct 16, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing S01289091-I1 as a alteration filing at 1430 Richmond Avenue, Staten Island, NY 10314. Its latest published status category is Approved, dated Oct 16, 2026. The filing records 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 16, 2026
Proposed scale
1 proposed dwelling unit
The building, not the filingopen housing violations, the owner of record and every filing at BIN 5031317Applicant of recordSee the 57 filings that name Steven R. Savino Architect PC
FiledSep 23, 2025
Current recordApproved
Proposed scale1 units
Recorded cost$48,000

What the filing says

A public-record reading of the proposed work.

Cap & remove existing sanitary fixtures & piping & cap & remove the gas piping & commercial cooking equipment that exist in landers market & install plumbing fixtures for ADA bath rm, install new slop sink & sewage ejector pump with associated piping.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 1-story store building built in 1957, on a 28,265 sq ft lot.

Built
1957
Last altered
1986
Floors
1
Residential units
0
Building type
Store building
Land use
Commercial and office
Zoning district
R3X
Lot area
28,265 sq ft
Building area
13,042 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 18, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 4 notices on file; the most recent was issued Oct 25, 2017.

  • Construction

    Issued Oct 25, 2017 — DUE TO VEHICLE IMPACTING BUILDING

  • Construction

    Issued Aug 3, 2014 — FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. THE BLDG HAS A WOOD BOW- STRING TRUSS ROOF. THE DEPARTMENT SERVED YOU A CURABLE COMM. ORDER (NOTICE OF VIOLATION) ON 5/30/2014 TO PRODUCE AN ENGR REPORT ON YOUR BLDG. NO ENGR REPORT HAS BEEN RECEIVED. COMPLY PER THE COMMISIONER'S ORDER

  • Construction

    Issued May 30, 2014 — BUILDING IS AN OCCUPIED 1 STORY RETAIL FACILITY WITH A WOOD BOWSTRING TRUSS. W/IN 60 DAYS OF VIO,OWNER TO ENG NYS(LIC)PE EXP W/WOOD TRUSS TO PROBE AND EVAL TRUSS.REPAIR DRWGS FILED W/ DOB IN 45 DAYS

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 18, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing S01289091-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 83,050 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
S01289091-I1
BBL
5015940010
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
1
Proposed dwelling units
1