NYC DOB record · X08008951-I1

1430 Webster Avenue

1430 Webster Avenue, Bronx, NY 10456

Alteration filing in Claremont Village-Claremont (East), Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 9, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X08008951-I1

1430 Webster Avenue

Bronx, NY 10456

Alteration filing · status dated Oct 7, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
251
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X08008951-I1 as a alteration filing at 1430 Webster Avenue, Bronx, NY 10456. Its latest published status category is Approved, dated Oct 7, 2026. The filing records 251 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 7, 2026
Proposed scale
251 proposed dwelling units
Applicant of recordSee the 1147 filings that name Joel Phagoo P.E. PLLC
FiledSep 23, 2022
Current recordApproved
Proposed scale251 units
Recorded cost$5,000

What the filing says

A public-record reading of the proposed work.

Installation of temporary chain link fence as per plans. chain link fence shall comply with chapter 33 of the 2014 NYC building code. no change in use, egress or occupancy under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 21-story elevator apartment building built in 1963, with 743 homes, on a 375,012 sq ft lot.

Built
1963
Floors
21
Residential units
743
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7-1
Lot area
375,012 sq ft
Building area
753,113 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 9, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 16 notices on file; the most recent was issued May 19, 2025.

  • Construction

    Issued May 19, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.OBSERVED AT EXP BROKEN,MISSING WINDOW PANE ON 16TH FL.LOOSE CAPPING PANEL AT ROOF FACI NG EXP4.EXP3 BROKEN WINDOW PANE 1ST FL NORTH AND SOUTH AND DAMAGED/MIS SING GLASS PANE BETWEEN 14TH TO 16TH FL AT EXP3.REMEDY:REPAIR AND/OR R EPLACE

  • Construction

    Issued May 19, 2025 — EMERGENCY WORK ORDER DUE TO BROKEN WINDOW PANE @ EXP 2 & 3 & DAMAGED GLASS PANEL EXP 3, ALSO LOOSE METAL TRIM @ ROOF AT EXPOSURE 4. REMEDY: IMMEDIATELY REMOVE LOOSE GLASS PANEL & SECURE AREA ON 14FL OF EXPOSURE 3. REPAIR BROKEN PANE AT EXPOSURE 2 & 3 1ST FL AND SECURE METAL TRIM ON EXPOSURE 4 ROOF AREA

  • Facade safety program

    Issued Dec 16, 2019

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 9, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X08008951-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 78,679 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X08008951-I1
BIN
2092077
BBL
2028950001
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
251
Proposed dwelling units
251