What the filing says
A public-record reading of the proposed work.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 12-story office building built in 1924, on a 3,248 sq ft lot.
- Built
- 1924
- Floors
- 12
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- C5-3
- Lot area
- 3,248 sq ft
- Building area
- 37,645 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 7 open notices on record for this building, out of 51 notices on file; the most recent was issued Mar 10, 2026.
- Construction
Issued Mar 10, 2026 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.OBSERVED LARGE VERTICAL CRACK ON EXP2 AT WEST NORTH CONER AND CRACK ON BULKHEAD AT WE ST CORNER.CRACK AND MISSING MORTAR ON PARAPET AREA AT WEST ELEVATION REMEDY:REPAIR AND/OR REPLACE
- Construction
Issued Sep 4, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED SPALLING STONE A EXPOSURE 1 AT PARAPET STONE COLUMNS. EXPOSURE 4 SOUTH ELEVATION SPALL STONE SOUTHEAST AND DEFECTED MASONRY OVER COMMERCIAL FRONT. ROOF: CRACK AT M/C ROOM. REMEDY: REPAIR AND/OR REPLACE
- Construction
Issued Aug 27, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AS NOTED AT THE TIME OF INSPECTION,I OBSERVED ON EXP1 SOUTH ELEV SPALLING TERRA COTTA AT PARAPET.EXP3 NORTH ELEV,DAMAGED DISINTERGRATING LINTEL ON THE TOP F LOOR.REMEDY:REPAIR AND/OR REPLACE DAMAGED TERRA COTTA AND LINTELS
4 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00528220-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00528220-I1
- BBL
- 1009930007
- Postal code
- 10018 · 376 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0