What the filing says
A public-record reading of the proposed work.
Facade alteration filed to repair the facade
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 8-story elevator apartment building built in 2013, with 25 homes, on a 7,183 sq ft lot.
- Built
- 2013
- Floors
- 8
- Residential units
- 25
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- R6
- Lot area
- 7,183 sq ft
- Building area
- 21,666 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 16 notices on file; the most recent was issued Feb 22, 2022.
- No report and / or late filing (facade)
Issued Feb 22, 2022 — FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
- Construction
Issued Apr 1, 2016 — COMMISSIONER'S ORDER FOR WORK DUE TO FIRE AT ADJACENT BUILDING AT 1429 DEKALB AVE. FIRE DAMAGED SOUTH FACING NON-STRUCTURAL STUCCO FACADE FIN ISH. PARTS OF FACADE FINISH IS LOOSE, OTHER PARTS MAY FALL AND BECOME LOOSE. THE CONDITION OF THE CLADDING IS A DANGER TO THE PUBLIC
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00448421-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 61,761 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00448421-I1
- BIN
- 3423703
- BBL
- 3032350042
- Postal code
- 11237 · 1644 filings
- Review type
- Standard Plan Examination
- Existing stories
- 9
- Proposed stories
- 9
- Existing dwelling units
- 28
- Proposed dwelling units
- 28