What the filing says
A public-record reading of the proposed work.
Facade restoration as per the drawings. no change in use, egress, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story office building built in 1930, on a 3,850 sq ft lot.
- Built
- 1930
- Last altered
- 1997
- Floors
- 2
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- C4-2
- Lot area
- 3,850 sq ft
- Building area
- 6,748 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 19, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 14 notices on file; the most recent was issued Dec 17, 2025.
- Construction
Issued Dec 17, 2025 — FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER PER SECTION 28.301.1 OF NYC ADMIN CODE. OBSERVED @ EXPOSURE ONE HORIZONTAL CRACKS AND DETERIORATED AND SPALLING MASONRY. ALSO EXPOSURE 3 NUMEROUS VERTICAL CRACKS AND EXPOSURE 4 SEVERE DAMAGED MASONRY AT PARAPET LEVEL. REMEDY: REPAIR AND/OR REPLACE
- Construction
Issued Dec 17, 2025 — EMERGENCY WORK ORDER DUE TO SIGNIFICANT CRACKING, DISPLACEMENT OF MASONRY ELEMENTS OPEN & WIDED CRACKS, STEP CRACKS & VERTICAL CRACKS AT PARAPET WALLS, CORNERS & MASONRY BANDS, VISIBLE SEPARATION OF UNITS @ JOINTS EXP3 W ELE. REMEDY: IMMEDIATELY PROVIDE SAFETY MEASURES @ EXP3 W TO COVER FULL EXPOSURE UNDER DIRECTION OF LICENSED PROFESSIONAL
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing S00741412-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- S00741412-I1
- BIN
- 5000019
- BBL
- 5000050003
- Postal code
- 10301 · 93 filings
- Review type
- Professional Certification
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








