NYC DOB record · B00295845-P1

144 Clymer Street

144 Clymer Street, Brooklyn, NY 11211

Alteration filing in South Williamsburg, Brooklyn. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00295845-P1

144 Clymer Street

Brooklyn, NY 11211

Alteration filing · status dated Nov 30, 2022

Current record
Approved
Proposed scale
Not stated
Dwelling units
6
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00295845-P1 as a alteration filing at 144 Clymer Street, Brooklyn, NY 11211. Its latest published status category is Approved, dated Nov 30, 2022. The filing records 6 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 30, 2022
Proposed scale
6 proposed dwelling units
The building, not the filingEvery filing at BIN 3428764, with the parcel and violation recordApplicant of recordSee the 601 filings that name A&d Engineering, PLLC
FiledAug 24, 2022
Current recordApproved
Proposed scale6 units
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Installation of PL fixtures in conjunction with NB #322020610

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

The Department of Buildings has 6 open notices on record for this building, out of 8 notices on file; the most recent was issued Sep 23, 2024.

  • Low pressure boiler

    Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION

  • 3 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00295845-P1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00295845-P1
BBL
3021730006
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
6
Proposed dwelling units
6
plumbing