NYC DOB record · M01315982-I1

1440 Broadway

1440 Broadway, Manhattan, NY 10018

Alteration filing in Midtown-Times Square, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Aug 29, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01315982-I1

1440 Broadway

Manhattan, NY 10018

Alteration filing · status dated Aug 25, 2026

Current record
Recorded as completed
Proposed scale
25 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01315982-I1 as a alteration filing at 1440 Broadway, Manhattan, NY 10018. Its latest published status category is Recorded as completed, dated Aug 25, 2026. The filing records 25 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Aug 25, 2026
Proposed scale
25 proposed stories
Complete building dossierView all 3 filings associated with BIN 1022563
FiledDec 17, 2025
Current recordRecorded as completed
Proposed scale25 stories
Recorded cost$300,000

What the filing says

A public-record reading of the proposed work.

Interior modification to the retail layout of the 1st and 2nd floor CVS retail tenant spaces. remove non-load bearing metal stud walls, relocate retail fixtures, replace floor and wall finishes.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 25-story office building built in 1924, on a 30,200 sq ft lot.

Built
1924
Last altered
2018
Floors
25
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C5-3
Lot area
30,200 sq ft
Building area
747,576 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 216 notices on file; the most recent was issued May 7, 2025.

  • Failure to correct swarmp conditions (facade)

    Issued May 7, 2025 — CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS

  • Construction

    Issued Oct 23, 2023 — EMERGENCY WORK ORDER DUE TO FAILURE TO PROTECT PUBLIC SAFETY MEASURE FOR DOCUMENTED UNSAFE FACADE FILING#903019.AS OF TODAY 10/23/23 INADEQ INADEQUATE SAFETY MEASURES IN PLACE AT EXP#3 NORTH ELEVATION REMEDY: PROVIDE ADEQUATE SIDE WALK SHED AT EXP#3 NORTH ELEVATION(N-E)CORNER EXTEND THE EDGE OF BLDG TO COURSE OF ADJACENT PROPERTY

  • Elevator

    Issued Aug 19, 2019

  • 1 further open notice is on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01315982-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01315982-I1
BBL
1009930011
Review type
Professional Certification
Existing stories
25
Proposed stories
25
Existing dwelling units
0
Proposed dwelling units
0
General construction