NYC DOB record · M00559613-S1

1445 Madison Avenue

1445 Madison Avenue, Manhattan, NY 10029

Alteration filing in East Harlem (South), Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 11, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M00559613-S1

1445 Madison Avenue

Manhattan, NY 10029

Alteration filing · status dated Nov 6, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
116
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M00559613-S1 as a alteration filing at 1445 Madison Avenue, Manhattan, NY 10029. Its latest published status category is Approved, dated Nov 6, 2026. The filing records 116 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 6, 2026
Proposed scale
116 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 1082312Applicant of recordSee the 105 filings that name Stv
FiledMay 25, 2022
Current recordApproved
Proposed scale116 units
Recorded cost$199,302

What the filing says

A public-record reading of the proposed work.

BLDG#2_Remove exist steam-fired domestic hot water heat exchanger, and install new gas water heaters, storage tank, all necessary accessories and valves. Install new gas meter assembly and gas piping to gas water heaters. Remove and replace sump pump.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 15-story elevator apartment building built in 1954, with 564 homes, on a 274,240 sq ft lot.

Built
1954
Floors
15
Residential units
564
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7-2
Lot area
274,240 sq ft
Building area
484,479 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 11, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 16 notices on file; the most recent was issued May 15, 2025.

  • Construction

    Issued May 15, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED DEFECTED BALCONY SLAB AT EXPOSURE 1 AND FACING EXPOSURE 4. DAMAGED MORTAR JOINTS AT EXPOSURE 2 AND 3. REMEDY: REPAIR AND/OR REPLACE

  • No report and / or late filing (facade)

    Issued Feb 22, 2022 — FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022

  • Facade safety program

    Issued Jan 13, 2020 — NYCHA UNSAFE CYCLE 8 REPORT FILED

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 10, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M00559613-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,006 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M00559613-S1
BBL
1016050024
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
116
Proposed dwelling units
116