NYC DOB record · X00902102-S1

1449 Shakespeare Avenue

1449 Shakespeare Avenue, Bronx, NY 10452

Alteration filing in Mount Eden-Claremont (West), Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 19, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X00902102-S1

1449 Shakespeare Avenue

Bronx, NY 10452

Alteration filing · status dated Sep 16, 2026

Current record
Approved
Proposed scale
4 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X00902102-S1 as a alteration filing at 1449 Shakespeare Avenue, Bronx, NY 10452. Its latest published status category is Approved, dated Sep 16, 2026. The filing records 4 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 16, 2026
Proposed scale
4 proposed stories
The building, not the filingopen housing violations, the owner of record and every filing at BIN 2088263Applicant of recordSee the 55 filings that name Ysrael A. Seinuk, P.C.
FiledAug 1, 2023
Current recordApproved
Proposed scale4 stories
Recorded cost$505,814

What the filing says

A public-record reading of the proposed work.

New elevator shaft in building. Design of new floor shafts. Detail concrete platform for wheel chairs in auditorium. New wheelchair lifts structure in auditorium and gym. Design of lintels for new and enlarged openings.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story educational building built in 1930, on a 77,101 sq ft lot.

Built
1930
Last altered
2005
Floors
4
Residential units
0
Building type
Educational building
Land use
Public facilities and institutions
Zoning district
R7-1
Lot area
77,101 sq ft
Building area
97,072 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 19, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 19 notices on file; the most recent was issued Nov 14, 2025.

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 18, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X00902102-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X00902102-S1
BBL
2028730027
Review type
Standard Plan Examination
Existing stories
4
Proposed stories
4
Existing dwelling units
0
Proposed dwelling units
0
Structural work