NYC DOB record · M01441790-S2

145 Central Park West

145 Central Park West, Manhattan, NY 10023

Alteration filing in Upper West Side (Central), Manhattan. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 4, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01441790-S2

145 Central Park West

Manhattan, NY 10023

Alteration filing · status dated Oct 2, 2026

Current record
Approved
Proposed scale
28 stories
Dwelling units
148
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01441790-S2 as a alteration filing at 145 Central Park West, Manhattan, NY 10023. Its latest published status category is Approved, dated Oct 2, 2026. The filing records 28 proposed stories and 148 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 2, 2026
Proposed scale
28 proposed stories and 148 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, the owner of record and every filing at BIN 1028714Applicant of recordSee the 248 filings that name Abs Engineering, PLLC
FiledOct 1, 2026
Current recordApproved
Proposed scale28 stories
Recorded cost$190,000

What the filing says

A public-record reading of the proposed work.

Filing herewith plumbing work for the renovation of apartment 8c on the 8th floor. no change to use, egress, or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 28-story elevator apartment building built in 1890, with 138 homes, on a 34,532 sq ft lot.

Built
1890
Last altered
2017
Floors
28
Residential units
138
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R10A
Lot area
34,532 sq ft
Building area
490,265 sq ft
Historic district
Upper West Side / Central Park West Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 4, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building. 86 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 4, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01441790-S2.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 75,295 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01441790-S2
BBL
1011270029
Review type
Standard Plan Examination
Existing stories
28
Proposed stories
28
Existing dwelling units
148
Proposed dwelling units
148