NYC DOB record · X01434674-I1

1459 Wythe Place

1459 Wythe Place, Bronx, NY 10452

Alteration filing in Mount Eden-Claremont (West), Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 2, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01434674-I1

1459 Wythe Place

Bronx, NY 10452

Alteration filing · status dated Aug 28, 2026

Current record
Approved
Proposed scale
6 stories
Dwelling units
73
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01434674-I1 as a alteration filing at 1459 Wythe Place, Bronx, NY 10452. Its latest published status category is Approved, dated Aug 28, 2026. The filing records 6 proposed stories and 73 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 28, 2026
Proposed scale
6 proposed stories and 73 proposed dwelling units
Applicant of recordSee the 20 filings that name Structural Engineering Buro
FiledJul 24, 2026
Current recordApproved
Proposed scale6 stories
Recorded cost$52,500

What the filing says

A public-record reading of the proposed work.

Limited facade restoration, including replacement of the damaged bricks, replacement of the damaged/corodded lintels and window sills.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story elevator apartment building built in 1929, with 73 homes, on a 17,500 sq ft lot.

Built
1929
Floors
6
Residential units
73
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R8
Lot area
17,500 sq ft
Building area
76,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 15 open notices on record for this building, out of 46 notices on file; the most recent was issued Oct 2, 2024.

  • Fail to certify class

    Issued Oct 2, 2024 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • Fail to certify class

    Issued Jul 24, 2024 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • Construction

    Issued Apr 26, 2024 — PARTIAL VACATE ORDER DUE TO MULTIPLE HAZARDOUS CONDITIONS CRACKED MASONRY BRICKS,CRACKED ROOF PARAPET & DETERIORATED WINDOW SILLS & CRACKED COPING STONES WERE OBSERVED. CONDITIONS HAVE MADE COURTYARDS AT EXP3 (WEST) & EXP#4 (N) REMEDY: VACATE ENTIRE COURTYARD AT EXPOSURE 3 - WEST & EXP4-NORTH.ONLY TO BE USED IN EMERGENCIES

  • 12 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01434674-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01434674-I1
BIN
2008120
BBL
2028440105
Review type
Standard Plan Examination
Existing stories
6
Proposed stories
6
Existing dwelling units
73
Proposed dwelling units
73
General construction