What the filing says
A public-record reading of the proposed work.
Brick replacement and repair of existing facade. no change to use egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story condominium built in 2003, with 18 homes, on a 4,750 sq ft lot.
- Built
- 2003
- Floors
- 7
- Residential units
- 18
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- R7-1
- Lot area
- 4,750 sq ft
- Building area
- 19,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 11 open notices on record for this building, out of 25 notices on file; the most recent was issued May 7, 2024.
- Construction
Issued May 7, 2024 — EMERGENCY WORK ORDER.IMMEDIATELY PROVIDE SAFETY MEASURES TO SECURE UNS AFE FACADE. NOTE AS PER UNSAFE-919246-9A-001 DATED 12/21 INICATED STEP CRACKS,SHIFTED,SPALLING,DEFECTED BRICKS AND MORTAR JOINTS AT EXP2 EAST ELEV SE CORNER 7TH FL PARAPET AREA AND EXP3 SOUTH ELEV SE CORNER 7TH F L PARAPET.REMEDY:PROVIDE SAFETY MEASURES AT EXP2 & 3 TO PROTECT PUBLIC
- (other bldgs types) - elevator affirmation of
Issued Sep 6, 2019 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
- Non-residential elevator periodic
Issued May 20, 2019 — FAILURE TO PERFORM CATEGORY 5 INSPECTION
8 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01064064-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01064064-I1
- BIN
- 4529628
- BBL
- 4050047502
- Postal code
- 11354 · 162 filings
- Review type
- Professional Certification
- Existing stories
- 7
- Proposed stories
- 7
- Existing dwelling units
- 23
- Proposed dwelling units
- 23