NYC DOB record · B01375085-S2

1461 53 Street

1461 53 Street, Brooklyn, NY 11219

New building filing in Borough Park, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed.

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Aug 29, 2026 · Verify the source row

Open full map
1461 53 Street record graphic showing the DOB filing status and stated proposal scale
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01375085-S2 as a new building at 1461 53 Street, Brooklyn, NY 11219. Its latest published status category is Approved, dated Aug 25, 2026. The filing records 5 proposed stories and 10 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Aug 25, 2026
Proposed scale
5 proposed stories and 10 proposed dwelling units
FiledJul 20, 2026
Current recordApproved
Proposed scale5 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Foundation work for 5 story and cellar new building

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story two-family home built in 1910, on a 4,007 sq ft lot.

Built
1910
Floors
2
Residential units
2
Building type
Two-family home
Land use
One and two family homes
Zoning district
R6
Lot area
4,007 sq ft
Building area
3,396 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 2, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01375085-S2.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01375085-S2
BIN
3138776
BBL
3056640050
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
5
Existing dwelling units
Empty in the source
Proposed dwelling units
10
Foundation workEarthwork