What the filing says
A public-record reading of the proposed work.
Subsequent filing of plumbing work in conjunction with DOB#q01448196-i1 (gc). work includes removal/installation of plumbing fixture at hall lounge in church as per the plans herewith. no change in use, egress, and occupancy under this job.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story place of worship built in 1957, on a 50,000 sq ft lot.
- Built
- 1957
- Last altered
- 1991
- Floors
- 3
- Residential units
- 0
- Building type
- Place of worship
- Land use
- Public facilities and institutions
- Zoning district
- R5
- Lot area
- 50,000 sq ft
- Building area
- 37,196 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 8 open notices on record for this building, out of 29 notices on file; the most recent was issued Apr 29, 2021.
- Failure to post energy
Issued Apr 29, 2021 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
- Failure to
Issued Feb 2, 2021 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
- Failure to
Issued Nov 2, 2020 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
5 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01448196-S1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,351 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01448196-S1
- BIN
- 4113876
- BBL
- 4050260035
- Postal code
- 11354 · 205 filings
- Review type
- Professional Certification
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 0
- Proposed dwelling units
- 0