What the filing says
A public-record reading of the proposed work.
Shed and fence
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 1-story garage or fuel station built in 1946, on a 44,904 sq ft lot.
- Built
- 1946
- Floors
- 1
- Residential units
- 0
- Building type
- Garage or fuel station
- Land use
- Parking facilities
- Zoning district
- R6
- Lot area
- 44,904 sq ft
- Building area
- 84,350 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 29, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 7 open notices on record for this building, out of 8 notices on file; the most recent was issued Aug 26, 2024.
- Construction
Issued Aug 26, 2024 — EMERGENCY WORK ORDER.NOTE ON ACTIVE PS CONSISTING OF 3 LEVELS,OBSERVED CRACK/SPALLING CONCRETE,EXPOSED REBAR FROM BEAM AND CEILING ON ALL 3 L EVELS AT SEVERAL LOCATIONS CAUSING IMMEDIATE HAZARD TO TRAFFIC.REMEDY: OWNER TO RETAIN A NYS REG DESIGN PROFESSIONAL TO DIRECT AND SUPERVISE THE INSTALLATION OF SAFETY MEASURES.ALL WORK TO BE DONE FULL TIME
- Failure to post energy
Issued Dec 1, 2022 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
- Failure to
Issued Nov 2, 2022 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
4 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00430087-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 91,085 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00430087-I1
- BIN
- 3428630
- BBL
- 3020880030
- Postal code
- 11201 · 6273 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








