NYC DOB record · B00027483-I1

147 Hope Street

147 Hope Street, Brooklyn, NY 11211

Alteration filing in Williamsburg, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 11, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00027483-I1

147 Hope Street

Brooklyn, NY 11211

Alteration filing · status dated Dec 28, 2020

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00027483-I1 as a alteration filing at 147 Hope Street, Brooklyn, NY 11211. Its latest published status category is Approved, dated Dec 28, 2020. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Dec 28, 2020
Proposed scale
Not stated in this filing
Applicant of recordSee the 956 filings that name Joel Phagoo P.E. PLLC
FiledMar 21, 2018
Current recordApproved
Proposed scaleNot specified
Recorded cost$18,000

What the filing says

A public-record reading of the proposed work.

Installation of scaffold as per drawings. scaffold shall comply with chapter #33 of the NYC building code. no change in use, occupancy or egress under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story condominium built in 2017, with 38 homes, on a 17,500 sq ft lot.

Built
2017
Floors
6
Residential units
38
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
M1-2/R6A
Lot area
17,500 sq ft
Building area
47,220 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00027483-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00027483-I1
BIN
3319526
BBL
3023757501
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
Empty in the source
Proposed dwelling units
Empty in the source