What the filing says
A public-record reading of the proposed work.
Filing for construction fence. no change to egress, use, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 1-story garage or fuel station built in 1925, on a 10,000 sq ft lot.
- Built
- 1925
- Floors
- 1
- Residential units
- 0
- Building type
- Garage or fuel station
- Land use
- Transportation and utility
- Zoning district
- R8A
- Lot area
- 10,000 sq ft
- Building area
- 10,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 20, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 6 notices on file; the most recent was issued Jul 24, 2026.
- Construction
Issued Jul 24, 2026 — FAILURE TO COMPLY W/COMMISSIONER'S ORDER#350801(072026FEU20402KR)DATED 7/20/2026 REQUIRING OWNER TO IMMED:1.PRTLLY DEMO UNSTABLE ROOF,2.INSTL BRACNG/SHORNG AS REQ'D TO STBLZE REMAINING WALL&ROOF,3.INSTLL TEMP ROOF TO MAKE BLDG WEATHRTGHT UNDR FULLTME ONSTE SPRVSN OF NYSPE W/ MEANS&METHDS SBMTTD FOR APPRVL TO FEU.WRK REQ'D TO STRT IMMED UPN APPR
- Construction
Issued Jul 20, 2026 — EMERGENCY WORK ORDER.THE ROOF AREA AROUND THE CENTER OR THE REAR WALL PRTLLY CLLPSD,&THE REAR WALL INADEQUATELY BRACD@THE ROOF CLLPSE AREA LOOSE BRCKS@TOP OF THE REAR WALL&FALLEN BRCKS&REAR YRD.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER #350601 (072026FEU20402KR) DATED 07/20/2026
- Construction
Issued Jul 20, 2026 — FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.THE ROOF AREA,ARND THE CENTER OF THE REAR WAL PRTLLY CLLPSD,&THE REAL WALL INADEQUATELY BRACD @THE ROOF CLLPSD AREA LOOSE BRCKS@TOP OF THE REAR WLL.OWNR TO RTAIN NYSPE TO EVAL THE ENT BLDG&RPAIR UNDR PRMT STRT WRK BY 9/7/26&CMPLTE/ SGN OFF BY 10/19/26
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 17, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01438009-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 87,269 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01438009-I1
- BBL
- 2028580019
- Postal code
- 10452 · 318 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 1
- Proposed dwelling units
- 1








