NYC DOB record · S01303360-I1

1475 Arden Avenue

1475 Arden Avenue, Staten Island, NY 10312

Alteration filing in Great Kills-Eltingville, Staten Island. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Aug 24, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · S01303360-I1

1475 Arden Avenue

Staten Island, NY 10312

Alteration filing · status dated Aug 20, 2026

Current record
Approved
Proposed scale
3 stories
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing S01303360-I1 as a alteration filing at 1475 Arden Avenue, Staten Island, NY 10312. Its latest published status category is Approved, dated Aug 20, 2026. The filing records 3 proposed stories and 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 20, 2026
Proposed scale
3 proposed stories and 1 proposed dwelling unit
FiledOct 21, 2025
Current recordApproved
Proposed scale3 stories
Recorded cost$270,000

What the filing says

A public-record reading of the proposed work.

Interior renovation and repair fire damage house framing at rear ,new windows , new vertical and horizontal enlargement at sntry , new steps masonry at entry , new basement steps and entry , new roof raming and roofing. new wooden deck in the back

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story one-family home built in 1976, on a 6,000 sq ft lot.

Built
1976
Floors
2
Residential units
1
Building type
One-family home
Land use
One and two family homes
Zoning district
R1-2
Lot area
6,000 sq ft
Building area
2,166 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 5 notices on file; the most recent was issued Oct 15, 2023.

  • Structurally compromised

    Issued Oct 15, 2023 — FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG.

  • Immediate

    Issued Sep 26, 2023 — SEAL ALL ACCESSIBLE OPENINGS TO PROTECT AND SAFEGUARD THE PUBLIC

  • Construction

    Issued Sep 25, 2023 — STRUCTURE RENDERED NON COMPLAINT. BUILDING HAS SUSTAINED EXTENSIVE FIRE DAMAGE, WINDOWS OUT AND ROOF OPEN TO THE ELEMENTS, CEILINGS & WALLS DAMAGED AT 1ST AND SECOND FLOOR. ALSO ROOF JOIST CHARRED AND DAMAGED AT SECOND FLOOR. VACATE ENTIRE BUILDING.

  • 2 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing S01303360-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
S01303360-I1
BIN
5069475
BBL
5053630058
Review type
Standard Plan Examination
Existing stories
3
Proposed stories
3
Existing dwelling units
1
Proposed dwelling units
1
General constructionStructural workFoundation workEarthwork