NYC DOB record · Q01457678-I1

148-18 134 Street

148-18 134 Street, Queens, NY 11430

Alteration filing in South Ozone Park, Queens. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 24, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01457678-I1

148-18 134 Street

Queens, NY 11430

Alteration filing · status dated Sep 22, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01457678-I1 as a alteration filing at 148-18 134 Street, Queens, NY 11430. Its latest published status category is Approved, dated Sep 22, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 22, 2026
Proposed scale
Not stated in this filing
Applicant of recordSee the 11 filings that name Twigcon LLC
FiledSep 9, 2026
Current recordApproved
Proposed scaleNot specified
Recorded cost$44,000

What the filing says

A public-record reading of the proposed work.

Direct replacement of two (2) rooftop units

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story hotel built in 2004, on a 39,149 sq ft lot.

Built
2004
Last altered
2017
Floors
6
Residential units
0
Building type
Hotel
Land use
Commercial and office
Zoning district
M1-2
Lot area
39,149 sq ft
Building area
75,838 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 24, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building. 27 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01457678-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 68,520 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01457678-I1
BIN
4257534
BBL
4118860001
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0