NYC DOB record · Q01471298-I1

148-29 Cross Island Parkway

148-29 Cross Island Parkway, Queens, NY 11357

Alteration filing in Whitestone-Beechhurst, Queens. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 28, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01471298-I1

148-29 Cross Island Parkway

Queens, NY 11357

Alteration filing · status dated Oct 26, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01471298-I1 as a alteration filing at 148-29 Cross Island Parkway, Queens, NY 11357. Its latest published status category is Approved, dated Oct 26, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 26, 2026
Proposed scale
Not stated in this filing
Applicant of recordSee the 443 filings that name New York Engineering ASSOC., P.C.
FiledOct 23, 2026
Current recordApproved
Proposed scaleNot specified
Recorded cost$45,000

What the filing says

A public-record reading of the proposed work.

Replace two HVAC units on the roof.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story office building built in 2007, on a 5,903 sq ft lot.

Built
2007
Floors
2
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
R2
Lot area
5,903 sq ft
Building area
5,148 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 28, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 11 notices on file; the most recent was issued Dec 17, 2021.

  • Non-residential elevator periodic

    Issued Dec 17, 2021 — FAILURE TO PERFORM CATEGORY 5 INSPECTION

  • Elevator

    Issued Dec 3, 2021

  • Private residential

    Issued Oct 1, 2012 — 2011 VIOS ISSUED TO ELEVATORS IN PRIVATE RES DWELLINGS(1 OR 2 FAMILY DWELLINGS)

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 28, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01471298-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 88,037 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01471298-I1
BIN
4102154
BBL
4044860034
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0