What the filing says
A public-record reading of the proposed work.
Plumbing worktype in conjunction with Alt I application 122193223. NEW GAS / ELECTRIC / INDIRECT WATER HEATER, NEW SANITARY / STORM HOUSE TRAP, NEW PLUMBING INFRASTRUCTURE, NEW RPZ ON WATER SERVICE LINE, NEW FIXTURES IN BATHROOMS, NEW KITCHEN APPLIANCES
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story condominium built in 1865, with 4 homes, on a 3,909 sq ft lot.
- Built
- 1865
- Last altered
- 2015
- Floors
- 6
- Residential units
- 4
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C6-2A
- Lot area
- 3,909 sq ft
- Building area
- 18,436 sq ft
- Historic district
- Tribeca South Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 29, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 50 notices on file; the most recent was issued Oct 7, 2014.
- Landmark
Issued Oct 7, 2014
- Local law 10/81 -
Issued Jan 13, 1997
- Plumbing
Issued Sep 1, 1995
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 29, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01361732-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 88,832 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01361732-I1
- BBL
- 1001467505
- Postal code
- 10013 · 947 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 4
- Proposed dwelling units
- 4