What the filing says
A public-record reading of the proposed work.
(GENERAL CATALYST 9TH FL BUILD OUT) Filing herewith architectural plans to include interior renovation and general construction work on the 9th floor. There will be no change of use, occupancy or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 13-story office building built in 1930, on a 10,524 sq ft lot.
- Built
- 1930
- Last altered
- 2017
- Floors
- 13
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- M1-5/R10
- Lot area
- 10,524 sq ft
- Building area
- 129,135 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 44 notices on file; the most recent was issued Oct 28, 2013.
- Elevator
Issued Oct 28, 2013
- Elevator
Issued Oct 28, 2013
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01437542-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01437542-I1
- BBL
- 1002330026
- Postal code
- 10013 · 279 filings
- Review type
- Professional Certification
- Existing stories
- 12
- Proposed stories
- 12
- Existing dwelling units
- 0
- Proposed dwelling units
- 0