What the filing says
A public-record reading of the proposed work.
Full demolition of the existing building.
Street Futures classifies this record as a full demolition based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story factory or industrial building built in 1929, on a 40,077 sq ft lot.
- Built
- 1929
- Last altered
- 2020
- Floors
- 2
- Residential units
- 0
- Building type
- Factory or industrial building
- Land use
- Industrial and manufacturing
- Zoning district
- M1-8A/R9-1
- Lot area
- 40,077 sq ft
- Building area
- 41,600 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 31, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 1 notice on file; the most recent was issued Mar 19, 2020.
- Construction
Issued Mar 19, 2020 — FTM DUE TO FIRE.BIN 4439393 1&2FL WOOD WALL FRAMING @EXP1 HAD MODERATE FIRE CHAR W/APROX 35LF OF 2FL EXP1 SHEATING BURNED/DETACHD NEAR EXP1/2 VARIOUS ROOF OPENING TEMPORAL SEALED ALONG EXP1.INT WOOD FRAMING HAD MODERATE CHAR @35'WX13'D AREA @CRNR EXP1/2.OWNR RETAIN NYSPE-EVAL BLDG &PREP DWGS.REPAIRS START UNDR PRMIT BY 4/20/2020 & COMPLT BY 6/19/2020
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 31, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01420311-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 90,393 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01420311-I1
- BIN
- 4439393
- BBL
- 4100020001
- Postal code
- 11435 · 239 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- Empty in the source