What the filing says
A public-record reading of the proposed work.
Subsequent filing of plumbing work in conjunction with DOB#q01414954-i1. (gc/st). work includes replacement of kitchen fixtures due to car accident impact. to comply with DOB vio26-01321, vio26-01322. no change in use, egress, and occupancy under this job
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story mainly residential with some commercial built in 1930, on a 4,272 sq ft lot.
- Built
- 1930
- Floors
- 3
- Residential units
- 2
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- R3-2
- Lot area
- 4,272 sq ft
- Building area
- 4,575 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 20, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 9 notices on file; the most recent was issued May 18, 2026.
- Construction
Issued May 18, 2026 — REQUESTING ENGINEERING REPORT. AT TIME OF INSPECTION OBSERVED DUE TO CAR IMPACTED BUILDING AT EXPO 2, 1ST FLOOR REAR OF STUCCO WALL DAMAGED INTERIOR WALL BOWED IN AT GAS PIPES AT FRYER INTERIOR KITCHEN, STRUCTURAL STABILITY IS IN QUESTION.
- Construction
Issued May 18, 2026 — STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED DUE TO CAR IMPACTED BUILDING AT EXPO 2, 1ST FLOOR REAR OF STUCCO WALL DAMAGED INTERIOR WALL BOWED IN AT GAS PIPES AT FRYER INTERIOR KITCHEN.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 20, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01414944-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,111 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01414944-S1
- BIN
- 4105612
- BBL
- 4046600006
- Postal code
- 11357 · 337 filings
- Review type
- Professional Certification
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 2
- Proposed dwelling units
- 2