NYC DOB record · M01180442-I1

149 Columbus Avenue

149 Columbus Avenue, Manhattan, NY 10023

Full demolition filing in Upper West Side-Lincoln Square, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedFull demolition

NYC Department of Buildings · w9ak-ipjd · accessed Oct 17, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01180442-I1

149 Columbus Avenue

Manhattan, NY 10023

Full demolition · status dated Oct 15, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01180442-I1 as a full demolition at 149 Columbus Avenue, Manhattan, NY 10023. Its latest published status category is Recorded as completed, dated Oct 15, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Full demolition
Latest status
Recorded as completed
Latest status date
Oct 15, 2026
Proposed scale
Not stated in this filing
The building, not the filingwhat it sold for, the owner of record and every filing at BIN 1028235Applicant of recordSee the 38 filings that name Exdem Engineering Services
FiledFeb 24, 2025
Current recordRecorded as completed
Proposed scaleNot specified
Recorded cost$5.5M

What the filing says

A public-record reading of the proposed work.

Full demolition of 7 story structure using hand held and mechanical means to assist

Street Futures classifies this record as a full demolition based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 7-story theatre built in 1978, on a 15,063 sq ft lot.

Built
1978
Floors
7
Residential units
0
Building type
Theatre
Land use
Commercial and office
Zoning district
C4-7
Lot area
15,063 sq ft
Building area
99,769 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 17, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01180442-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 83,050 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01180442-I1
BBL
1011190061
Review type
Standard Plan Examination
Existing stories
7
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
Empty in the source