NYC DOB record · M01361672-S1

149 East 18 Street

149 East 18 Street, Manhattan, NY 10003

Alteration filing in Gramercy, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 1, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01361672-S1

149 East 18 Street

Manhattan, NY 10003

Alteration filing · status dated Aug 27, 2026

Current record
Approved
Proposed scale
4 stories
Dwelling units
4
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01361672-S1 as a alteration filing at 149 East 18 Street, Manhattan, NY 10003. Its latest published status category is Approved, dated Aug 27, 2026. The filing records 4 proposed stories and 4 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 27, 2026
Proposed scale
4 proposed stories and 4 proposed dwelling units
The building, not the filingwhat it sold for, apartment sizes, the owner of record and every filing at BIN 1078735Applicant of recordSee the 1 filings that name Meyer Consulting Engineers
FiledJun 18, 2026
Current recordApproved
Proposed scale4 stories
Recorded cost$18,000

What the filing says

A public-record reading of the proposed work.

Structural work filed to resolve violations v 042009cex01ads & v 042009cex02ads. no change in use, occupany, or egress

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story elevator apartment building built in 1854, with 6 homes, on a 3,466 sq ft lot.

Built
1854
Last altered
1986
Floors
4
Residential units
6
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R8B
Lot area
3,466 sq ft
Building area
7,733 sq ft
Historic district
Gramercy Park Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 23 notices on file; the most recent was issued Jan 18, 2013.

  • Elevator

    Issued Jan 18, 2013

  • Construction

    Issued Apr 20, 2009 — WORK DOES NOT CONFORM TO APPROVED CONST DOCUMENTS METAL C-JOISTS INSTA LLED TO SISTER EXISTING WOOD JOISTS AT MEZZANINE NOT SHOWN ON PLANS REMEDY: AMEND PLANS AND CONFORM TO AMENDMENTS

  • Construction

    Issued Apr 20, 2009 — INADEQUATE DETAILS ON APPROVED PLANS FOR 1 MASONRY WALL ON PLAN BETWEE N UPPER BATH MEZZANINE DOES NOT EXIST AND FIRE RATED WALL CONSTRUCTION REQUIRED 2. NO ANCHORAGE DETAILS FOR NEW FLOOR JOISTS IN MASONRY WALL CINDER UPPER BATH REQUIRED 72" ON CENTER REMEDY: AMEND PLANS

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01361672-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01361672-S1
BBL
1008740033
Review type
Professional Certification
Existing stories
4
Proposed stories
4
Existing dwelling units
4
Proposed dwelling units
4
Structural work