What the filing says
A public-record reading of the proposed work.
Installation of heavy duty sidewalk shed during building alteration, filed separately. sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, occupancy or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 12-story office building built in 1914, on a 7,532 sq ft lot.
- Built
- 1914
- Last altered
- 1985
- Floors
- 12
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- C6-4.5
- Lot area
- 7,532 sq ft
- Building area
- 52,851 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 23, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 28 open notices on record for this building, out of 88 notices on file; the most recent was issued Mar 6, 2026.
- Construction
Issued Mar 6, 2026 — FTM BLDG. OBSERVED ON EXP1: CRACKS IN TERRACOTTA @ MULTI FLRS & LOCAT; ON EXP3: BROKEN WINDOWSILL; BROKEN WINDOW PAIN. EXP4 E.ELEV: DAMAGED BROKEN WINDOWSILL; DMAGED CRACKED BRICK WORK. ROOF: DEFECTIVE, MISSING MORTAR JOINTS ON CHIMNEY; DAMAGED MISSING COPING STONE ON PARPET WALL REMDY: REPAIR AND/OR REPLACE ALL DAMAGED, DEFECTIVE CONDITI ON FACADE
- Low pressure boiler
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
- Low pressure boiler
Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
25 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 23, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00051265-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 71,094 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00051265-I1
- BIN
- 1034225
- BBL
- 1012600028
- Postal code
- 10036 · 548 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source