What the filing says
A public-record reading of the proposed work.
Plumbing work filed in conjunction with the apartment renovation as per plan. No change in use, egress, or occupancy under this application
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 11-story elevator apartment building built in 1947, with 73 homes, on a 12,821 sq ft lot.
- Built
- 1947
- Floors
- 11
- Residential units
- 73
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R8B
- Lot area
- 12,821 sq ft
- Building area
- 89,840 sq ft
- Historic district
- Upper West Side / Central Park West Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 32 notices on file; the most recent was issued Mar 5, 2025.
- Fail to certify class
Issued Mar 5, 2025 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
- Fail to certify class
Issued Dec 11, 2024 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
- Construction
Issued Oct 2, 2024 — EMERGENCY WORK ORDER 10/2/24 DUE TO DEFECTIVE FACADE. 1) SPALLING CONCRETE SLAB BALCONY AT 10TH STORY AT EXPOSURE #1 SOUTH ELEVATION REMEDY: IMMEDIATELY PROVIDE SAFETY MEASURES AND INSTALL SIDE WALK SHED AT EXPOSURE 1 SOUTH ELEVATION (WEST 84TH STREET) REPAIR DEFECTIVE SLAB
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01455764-S1.
- Current status updated02
The latest recorded filing status is “Plan Examiner Review.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01455764-S1
- BBL
- 1011980019
- Postal code
- 10024 · 355 filings
- Review type
- Standard Plan Examination
- Existing stories
- 10
- Proposed stories
- 10
- Existing dwelling units
- 78
- Proposed dwelling units
- 78








