NYC DOB record · B00493381-I1

150 Joralemon Street

150 Joralemon Street, Brooklyn, NY 11201

Alteration filing in Brooklyn Heights, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00493381-I1

150 Joralemon Street

Brooklyn, NY 11201

Alteration filing · status dated Nov 11, 2021

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
89
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00493381-I1 as a alteration filing at 150 Joralemon Street, Brooklyn, NY 11201. Its latest published status category is Recorded as completed, dated Nov 11, 2021. The filing records 89 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Nov 11, 2021
Proposed scale
89 proposed dwelling units
Complete building dossierView all 10 filings associated with BIN 3002539Applicant of recordSee the 1 filings that name 3 Hub Architecture PLLC
FiledApr 19, 2021
Current recordRecorded as completed
Proposed scale89 units
Recorded cost$22,000

What the filing says

A public-record reading of the proposed work.

Plumbing works in conjunction with Alt-II applicaiton#: B00455233. No change in use, egress, and occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 12-story elevator apartment building built in 1925, with 89 homes, on a 8,020 sq ft lot.

Built
1925
Last altered
1978
Floors
12
Residential units
89
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
C5-2A
Lot area
8,020 sq ft
Building area
93,500 sq ft
Historic district
Brooklyn Heights Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 7 open notices on record for this building, out of 46 notices on file; the most recent was issued Feb 21, 2022.

  • Hazardous condition (facade)

    Issued Feb 21, 2022 — CYCLE 9A UNSAFE REPORT FILED

  • Low pressure boiler

    Issued May 15, 2014 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT

  • Construction

    Issued Apr 4, 2014

  • 4 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00493381-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00493381-I1
BBL
3002640017
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
89
Proposed dwelling units
89