NYC DOB record · M01413870-I1

150 West 56 Street

150 West 56 Street, Manhattan, NY 10019

Alteration filing in Midtown-Times Square, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 13, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01413870-I1

150 West 56 Street

Manhattan, NY 10019

Alteration filing · status dated Sep 10, 2026

Current record
Approved
Proposed scale
70 stories
Dwelling units
353
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01413870-I1 as a alteration filing at 150 West 56 Street, Manhattan, NY 10019. Its latest published status category is Approved, dated Sep 10, 2026. The filing records 70 proposed stories and 353 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 10, 2026
Proposed scale
70 proposed stories and 353 proposed dwelling units
Applicant of recordSee the 1 filings that name Rietveld Architects LLP
FiledJul 31, 2026
Current recordApproved
Proposed scale70 stories
Recorded cost$125,000

What the filing says

A public-record reading of the proposed work.

Apartment renovation including modification of interior non-load bearing partitions and lighting work. Related plumbing work filed under M01413870-S1. No change to occupancy, use or egress.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 70-story condominium built in 1987, with 337 homes, on a 24,237 sq ft lot.

Built
1987
Floors
70
Residential units
337
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
C6-6.5
Lot area
24,237 sq ft
Building area
698,686 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 33 open notices on record for this building, out of 168 notices on file; the most recent was issued Jun 23, 2024.

  • Failure to submit

    Issued Jun 23, 2024 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)

  • Failure to submit

    Issued Apr 22, 2023 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022)

  • No report and / or late filing (facade)

    Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023

  • 30 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01413870-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01413870-I1
BIN
1076177
BBL
1010087503
Review type
Standard Plan Examination
Existing stories
70
Proposed stories
70
Existing dwelling units
353
Proposed dwelling units
353
General construction