NYC DOB record · M01250384-S2

150 William Street

150 William Street, Manhattan, NY 10038

Alteration filing in Financial District-Battery Park City, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 17, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01250384-S2

150 William Street

Manhattan, NY 10038

Alteration filing · status dated Oct 15, 2026

Current record
Approved
Proposed scale
20 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01250384-S2 as a alteration filing at 150 William Street, Manhattan, NY 10038. Its latest published status category is Approved, dated Oct 15, 2026. The filing records 20 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 15, 2026
Proposed scale
20 proposed stories
The building, not the filingopen housing violations and every filing at BIN 1001280Applicant of recordSee the 19 filings that name Dj Associates Architect,pc
FiledSep 18, 2025
Current recordApproved
Proposed scale20 stories
Recorded cost$19,400

What the filing says

A public-record reading of the proposed work.

Existing plumbing fixtures to be capped and removed. No change to egress, use or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 20-story office building built in 1927, on a 30,332 sq ft lot.

Built
1927
Last altered
1990
Floors
20
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C6-4
Lot area
30,332 sq ft
Building area
463,679 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 20, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 6 open notices on record for this building, out of 331 notices on file; the most recent was issued Apr 12, 2022.

  • Construction

    Issued Apr 12, 2022 — UNLSWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. ON APRIL 30, 2020 THE RESPONDENT WAS ORDERED TO IMMED HIRE A REG DESIGN PROF TO INSPECT THE ENTIRE BLDG AND FILE AND PERMIT ALL REPAIRS. AS OF THE DATE OF THIS VIOLATION, THERE ARE NO JOBS FILED OR PERMITS OBTAINED REMEDY: COMPLY WITH CODE

  • Elevator

    Issued Feb 24, 2021

  • Construction

    Issued Apr 30, 2020 — TIME OF INSPECTION-NUMBER OF LOCATIONS FIRE PROTECT STEEL STRUCTURAL ELEMENTS OF FLR FRAMING MISSING,OPENINGS IN CONCRTE FL SLABS MAY HAVE REDUCED REQUIRED FIRE RESISTANCE & BARRIER BTWN FLRS. OWNER IMNED HIRE REGISTRED DESIGN PROFESS,EXPERC'D W TYPE OF CONSTRCT.DESCRED-INSPECT G BLDG ENTIR,PREP DWGS FOR REMEDI RK CORRECT DEFICIENT FILE&PRMT ALL WRK

  • 3 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 20, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01250384-S2.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 84,915 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01250384-S2
BBL
1000930001
Review type
Professional Certification
Existing stories
20
Proposed stories
20
Existing dwelling units
0
Proposed dwelling units
0