What the filing says
A public-record reading of the proposed work.
Propose new illuminated front lit channel letters on existing aluminum wall for existing commercial space. no change to use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 54-story office building built in 1970, on a 65,764 sq ft lot.
- Built
- 1970
- Last altered
- 1990
- Floors
- 54
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- C6-7T
- Lot area
- 65,764 sq ft
- Building area
- 1,721,814 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 10 open notices on record for this building, out of 299 notices on file; the most recent was issued Apr 15, 2022.
- Construction
Issued Apr 15, 2022 — EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE OBSERVED AT SOUTH ELEV, EXP2, SHIFTING/BULGED FACADE STONE PANEL. REMEDY: IMMED PROVIDE SIDEALK SHED WITH APPROX LENGTH OF 100 FEET AT SOUTH ELEV TO SECURE PUBLIC SAFETY
- Failure to correct swarmp conditions (facade)
Issued Feb 21, 2022 — CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS
- Elevator
Issued Nov 8, 2007
7 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 18, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01438722-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01438722-I1
- BBL
- 1010160036
- Postal code
- 10036 · 466 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0