What the filing says
A public-record reading of the proposed work.
Installation of a new sidewalk shed at exposures #1 & 3 as per plan to remedy work without permit ecb violation #39534302p.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story store building built in 2004, on a 7,242 sq ft lot.
- Built
- 2004
- Floors
- 2
- Residential units
- 0
- Building type
- Store building
- Land use
- Commercial and office
- Zoning district
- R3-2
- Lot area
- 7,242 sq ft
- Building area
- 6,205 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 8, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 7 notices on file; the most recent was issued Oct 28, 2024.
- Immediate
Issued Oct 28, 2024 — INSTALL OF APPROX 350.50 LF SIDEWALK SHED. HYLAN BLVD (AT THE INTERSEC TION OF EXP1 & EXP2): FROM THE INTERSECTION OF EXP1 & EXP2 OF THE EXIS TING STRUCTURE KNOWN AS 1525 HYLAN BLVD, APPROX 11.50' SW TO INTERSECT ION OF THE NEW SIDE OF HYLAN BLVD & NW SIDE OF HYLAN BLVD & THE NE SID E OF BURGHER AVE, 74.91' NW TO THE SE SIDE OF ADELE ST & THE NE SIDE O
- Construction
Issued Oct 26, 2024 — FTM BUILDING & PARTS IN A CODE COMPLIANT MANNER: THE LOT LINE FENCE EMBEDMENT BELOW GRADE IS SHOWN RELATIVELY SHALLOW FOR THE HEIGHT PROJECTION ABOVE GRADE AS DEPICTED IN SUBMITTED DRAWINGS. NO MEANS AND METHODS FOR THE DEMOLITION/REMOVAL OF THE 15'FT HIGH CORRUGATED STEEL FENCE IN APPROVED DRWAWINGS # S010616751. ENGINEERS REPORT REQUIRED.
- Construction
Issued Oct 26, 2024 — FTM BUILDING & PARTS IN A CODE COMPLIANT MANNER: THE LOT LINE FENCE EMBEDMENT BELOW GRADE IS SHOWN RELATIVELY SHALLOW FOR THE HGT PROJECTION ABOVE GRADE AS DEPICTED IN SUBMITTED DRAWINGS WITH THE POSSIBILITY OF COLLAPSE INTO THE PARKING LOT OR UNTO THE SIDEWALK.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing S01408338-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- S01408338-I1
- BIN
- 5146401
- BBL
- 5033290056
- Postal code
- 10305 · 145 filings
- Review type
- Professional Certification
- Existing stories
- 1
- Proposed stories
- 1
- Existing dwelling units
- 0
- Proposed dwelling units
- 0